Progressing Medical Technology from Bench to Bedside
MTIF is a two-storey building, located at our Clifton Campus. It is part of a dual-site facility which will produce the next generation of medical devices and technologies. The site includes laboratories, clean-rooms, and an extensive range of specialist equipment to help key industry players both enhance and accelerate their research and development.
The second facility — located at the Boots site on the Nottingham Enterprise Zone — is dedicated to the development, clinical production and commercialisation of new medical technologies.
Key project information
MTIF opened in April 2020
The building was designed by Maber architects
The building was constructed by Henry Brothers
The total dual-site facility total project cost was £23 million